top of page


Is My Water Body Suitable for Floating Solar? A Site Assessment Checklist
Is your lake, reservoir, quarry, industrial basin or port suitable for floating solar? Use this practical checklist to assess site conditions, access, mooring, grid connection, environmental constraints and project viability.

HelioRec Company
3 days ago9 min read


Why load-based engineering matters for floating solar reliability
Floating solar reliability depends on understanding the real forces acting on every component. Discover how site-specific load analysis, fatigue assessment and properly engineered mooring systems help FPV plants withstand decades of wind, waves and changing water conditions.

HelioRec Company
Aug 316 min read


Can Floating Solar Generate Clean Energy and Support Aquatic Biodiversity?
Floating solar can do more than generate renewable electricity. With careful site selection, ecological design and long-term monitoring, it may also support aquatic habitat enhancement.

HelioRec Company
Aug 185 min read


Environmental Impact Assessment for Floating Solar: the Typical Process, Timeline, and Cost in Europe
Learn how the Environmental Impact Assessment process works for floating solar projects in Europe, including the key stages, realistic 18–24-month timeline, typical costs, and how low-impact system design can simplify permitting.

HelioRec Company
Aug 45 min read


HELIOREC Secures €496,575 in European Union Funding to Accelerate the Future of Coastal Floating Solar
HelioRec has been awarded €496,575 in European Union FEDER funding to accelerate HELIOMAR, a €1.1 million research project developing the next generation of coastal floating solar technology. Supported by the Pays de la Loire Region, the project will strengthen European innovation, sustainable energy production and industrial competitiveness.

HelioRec Company
Jul 25 min read
bottom of page
